
- At the Fairport donation center, we completed a patterned VCT in the draw area, installed LVT in the offices and main hallways, carpet in the entry and waiting area, and ceramic floor and wall tiles in the bathrooms.
- At the Henrietta processing location we have completed two main conference rooms, one of the 5 large cubical areas, and a training room in carpet tile. We have renovated all the existing stairwells with new stair treads, rubber tile, and walk-off style carpet tile. With plans to completely renovate all of the existing bathrooms in the entire building in 2026.




