The American Red Cross

  1. At the Fairport donation center, we completed a patterned VCT in the draw area, installed LVT in the offices and main hallways, carpet in the entry and waiting area, and ceramic floor and wall tiles in the bathrooms.
  2. At the Henrietta processing location we have completed two main conference rooms, one of the 5 large cubical areas, and a training room in carpet tile. We have renovated all the existing stairwells with new stair treads, rubber tile, and walk-off style carpet tile. With plans to completely renovate all of the existing bathrooms in the entire building in 2026.

Related Works